Harpa Development

In September 2017, excavations began on a large three tenancy commercial / industrial building in Tauriko.

Early excavations revealed a natural spring on site.  This was required to be pumped out continuously until such time as the foundations, Precast concrete panels and structural steel frame were erected allowing  footings and floor to be poured.  A heavy gauge polythene and over half a metre of concrete has effectively sealed the floor of the building from on-site groundwater.  Walls below ground level are sealed with swelltite tanking

The building was completed September 2018, having been put on hold briefly until tenants were secured.  Roofing is longrun Colorsteel and the cladding features a textured prefinished lightweight panel from NZ Brick Distributors.

Each tenancy includes a 2 storey office/ administration /show room area and a large open warehouse.