Cameron Road Retail Development

Matua Pine Trust – Stage 2 Development

This was another successful design and build project completed by Hawes Building Solutions.  We were selected to complete this project after winning a rigorous design and build proposal and selection process.

The programme was tight with the complete design, consent and construction process having to be completed within 6 months.  The project involved the construction of a 1750m2 retail complex separated into 4 tenancies, each with their own set of amenities.

Construction included concrete foundations, structural steel frames, precast concrete panel walls and colorsteel roofing. The commercial aluminium and glass shop front was over 100m in length.

Other features of the building included decorative concrete panels at each end and also two large architectural rain screen structures manufactured in steel and acrylic panel.

Interior work included toilet and staff facilities and steel stud full height inter-tenancy walls.  Full HVAC and electrical installations were also provided to individual shops as required.  Exterior work included all drainage, concrete service lanes at the rear, cobble stone paving and a roof canopy to the entire length of the shop front.

The development was completed on time and to budget with the first store opening in December 2013 ready for Christmas.